
Deck substructure on gravel and soil beside an AC unit
The gaps between the joists are gravelled and one section has been levelled with sand. The AC unit stands at the foot of the wall.
- Category
- Decking and Flooring

The gaps between the joists are gravelled and one section has been levelled with sand. The AC unit stands at the foot of the wall.