
Half-laid deck and timber railing
The laid boards run parallel to the railing while the battens on the right half are still bare. Tools and parts left for the installation can be seen on top.
- Category
- Decking and Flooring

The laid boards run parallel to the railing while the battens on the right half are still bare. Tools and parts left for the installation can be seen on top.